Time | State | Township/City | Pad | Latitude | Longitude | 911 Address | Weather | Well Lease | Well # | Well Field | Personnel/Witness Name | Personnel/Wittness Phone | Company | Position | Hitch Days | Years Oil/Gas | Years w/Comp. | Task | Summary | Spill Amount | On containment | Spill contained | NNE Contacted | DEP Contacted | Spill Line Contacted | Notification Timeline | Spill Cleaned Up | Follow Up Required | Corrective Action | Supervisor Name | Supervisor Email | Supervisor Phone | Supervisor Office Phone | Comp. Man Name | Comp. Man Email | Comp. Man Phone | Comp. Man Office Phone | NNE Name | NNE Email | NNE Phone | NNE Office Phone | NNE Name | NNE Email | NNE Phone | NNE Office Phone | NNE HSE Name | NNE HSE Email | NNE HSE Number | NNE HSE Office Phone | SUBMITTEE | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
06:30 AM | WV | Fairview | McClellan | 39.667166 | -80.096846 | 326 Harvey Run Road, Fairview wv | Cool & Rainy | McClellan | 6H | Battelle | Bobby Gilbert | (903) 486-2689 | Patterson | Toolpusher | 9 | 15 | 15 | Pumping slug to finish tripping out of hole | While tripping out of the hole, the fluid flow path was connected to the trip tank as normal. When it was time to pump a slug, the Driller called on radio for derrick hand to line up on the flow line and off the trip tank. The derrick hand confirmed the flowline was ready. Driller began pumping and immediately noticed an increase in pump pressure and shut off pumps. The back yard came across radio and said he was seeing mud coming across the choke skid. After investigation the main flowline valve was left closed causing pressure to build up and blow out the seal between the flowline and elkhorn. There was a miss communication, and the motorman shut the valve while the derrick hand was in the derrick tripping pipe. The derrick hand assumed the valve was still open. | 16 barrels | All except 10 gallons | All except 10 gallons | Yes, Sam Barker, Josh Dalton & Andy Travis | Yes, Bryan Harris inspector | No | Immediately to NNE. Couple hrs later for inspector to return call. | Outside of containment has been cleaned up, waiting on clean up crew to clean rig and mats | After rig is moved off we will clean up mats and plastic under mats | Shut down, have safety meeting, clean up gravel outside of containment, re connect flowline to elkhorn, chain down hammer seal | Bobby Gilbert | Email hidden; Javascript is required. | (903) 486-2689 | (903) 486-2689 | Sam Barker | Email hidden; Javascript is required. | (304) 629-2284 | (304) 629-2284 | Josh Dalton | Email hidden; Javascript is required. | (724) 825-6859 | (724) 825-6859 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Josh Dalton | |
03:07 PM | WV | Fairview | McClellan | 39.6219724 | -80.2741675 | 326 Harvey Run Rd | Sunny/ Clear | McClellan | 5H, 9H, 13H & 17H | Battelle | Deshawn Holyfield | (412) 443-0741 | Select Energy Services | Laborer | 4 | 0 | 0 | Transferring produced water from the ASTs on the McClellan pad to the frac tank on the McClellan staging area in order to load out trucks. | AT APPROXIMATELY 3:07PM, ON APRIL 2, 2021, NNE WAS NOTIFIED THAT THE FRAC TANK AT THE MCCLELLAN STAGING AREA WAS OVERFLOWING. THE SELECT ENERGY SERVICES ("SES") HAND THAT WAS SUPPOSED TO BE OVERSEEING THE PUMPING AND TANK FILLING WAS DISTRACTED BY HIS PHONE AND ALLOWED THE TANK TO OVERFLOW. PRODUCED WATER WAS PUMPED INTO THE TANK TO THE POINT THAT THE TANK ITSELF OVERFLOWED INTO THE SECONDARY CONTAINMENT, THEN BREACHED THE SECONDARY CONTAINMENT AND WAS RELEASED ONTO THE GROUND, AN ESTIMATED 50 BBL WAS RELEASED ONTO THE GROUND. THE PUMP WAS IMMEDIATELY SHUT DOWN TO ELIMINATE THE SOURCE. WATER TRUCKS WERE DISPATCHED IMMEDIATELY TO EVACUATE ALL WATER FROM THE SECONDARY CONTAINMENT AND GROUND. E & S CONTROLS WERE PLACED IN ORDER TO MINIMIZE IMPACTS AND PREVENT FURTHER CONTAMINATION. NO STREAMS OR WETLANDS WERE AFFECTED BY THE SPILL. SES DISPATCHED MCCUTCHEON, AN ENVIRONMENTAL CLEAN-UP CREW, TO FULLY ADDRESS THE SPILL AREA. THE WV DEP INSPECTOR, BRYAN HARRIS, WAS NOTIFIED, AS WELL AS THE SPILL HOTLINE (REFERENCE ID 31-13410). MR. HARRIS VISITED THE SITE AND WAS HAPPY WITH THE STEPS TAKEN AND PLAN AHEAD. SES WILL BE COMPLETING A SPILL REPORT AND WILL SUBMIT. | 50 BBL | No | Spill has been contained | Yes | Yes | Yes | 15:07 - NNE notified of spill; 15:33 - NNE EH&S notified; 15:37 - WV DEP Inspector notified (VM); 17:11 - WV DEP Inspector confirmed; 18:29 - WV Spill Hotline notified. | In progress as of 19:50 | SES will follow up with spill report | SES employee terminated from this NNE site as well as any others | Micah Kraf | Email hidden; Javascript is required. | (412) 614-9646 | (412) 443-0741 | Anthony Carlson | Email hidden; Javascript is required. | (304) 216-8886 | (304) 216-8886 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Andy Travis | |
07:00 AM | WV | Fairview | McClellan | 39.621619 | 80.278602 | 326 Harvey Run Road | Cloud Cover/Cold | McClellan | 14H | Battelle | Eirc Boone | (304) 377-6666 | NNE | Consultant | 9 | 25 | 3 | Frac McClellan 14H | While performing walk around found approximently 10 gal off road diesel on containment under pump #11 & #13. Spill was cleaned up, leak was found to be coming from braided fuel pump line on pump #11. Pump was shut down and line replaced. Fuel had also breached containment through a bad seam and was trapped between main containment and Felt. Containment was removed, fuel was cleaned up, rock was removed, new felt and containment was laid. | 10 gal | Yes | Yes, but breached containment | Yes | No | No | Immediate | Yes | No | Immediately report all spills | Jim Gallis | Email hidden; Javascript is required. | (740) 252-8508 | (740) 453-9302 | Eric Boone | Email hidden; Javascript is required. | (304) 377-6666 | (304) 377-6666 | Criss Vangilder Criss Vangilder | Email hidden; Javascript is required. | (405) 757-8725 | (405) 757-8725 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Criss VanGilder | |
08:00 PM | WV | Fairview | McClellan | 39.621619 | 80.278602 | 326 Harvey Run Road | Snow/Ice | McClellan | 14H | Battelle | Eric Boone | (304) 377-6666 | NNE | Consultant | 9 | 25 | 3 | Frac Operations on the McClellan 6H, 10H, 14H | Following up from prior report from unknown source of spill resulting in spill off containment on 2/10/21 at first was undetermined later was found to be SI SteamStream SC- 405. The leak originated on containment at a camlock on Scale line between scale ISO to blender. The camlock was not secured properly resulting in a slow leak of 600 gal of scale over the course of 12-24 hrs. The scale mixed with snow melt and rain water on containment traveled and collected at the low point of containment berm then leaking through 3 cracked seams in containment breching containment then collecting in standing water off containment. On 2/10/21 containment was cleaned and standing water directly affected off containment was picked up and desposed of in produced water tanks. A sump/trench was cut outside containment to collect and catch any residual that may accumulate. On 2/11/21 another 4-5 gal was picked up with vac truck that had accumulated over the course of 24 hrs. A 40'X70' section of containment was cut out and removed to inspect for any accumulation that could be traped under containment, no accumulation was visibly found. Containment repair replacing the removed section is underway and will be completed before moving removed frac equipment back on. | 600 gal | Yes, but breached | Yes | Eric Boone/Andy Travis/Josh Frazier/Criss Vangilder | Yes | No | Notified at the time of finding/Cleaned up at that time | Yes | Yes, will continue to monitor spill location | Double lock all camlocks with zip ties or duct tape | Criss VanGilder | Email hidden; Javascript is required. | (405) 757-8725 | (405) 757-8725 | Eric Boone | Email hidden; Javascript is required. | (304) 377-6666 | (304) 377-6666 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 951-0909 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Criss VanGilder | |
08:35 PM | WV | Fairview | Lemley Frac | 39.662820 | -80.166166 | Mount Harmon Rd | Clear | Lemley | n/a | Blacksville | Emily Stier | (304) 709-1980 | NSJ for Bear Contracting | Water Line Inspection | 4 | 6 | 2 | Water line ARV inspection | While inspecting the Kassay MEPCO line on night shift, a spill was observed coming from the ARV located on the Eddie Sine property. The ARV was locked and other than the water leaking out of the vault appeared to be in good condition. Attempts were made to close the valve to shut off the flow of additional water. Anthony Carlson was notified and drove out to location from his home, he was able reach into the vault while full of produced water and shut the valve below the ARV assembly, which stopped the flow of additional water at approximately 10:30 pm Friday night. | Unknown quantity | Spill was out of containment | Spill was not contained but was stopped | NNE was contacted immediately | Contacted Bryan Harris Saturday 6/26/2021 | Called in to spill hotline 9am on 6/26/2021 ref # 31-15727 | Immediate Notification | Spill has not been cleaned up | Follow up required | Corrective action TBD | Rob Feathers | Email hidden; Javascript is required. | (304) 918-8993 | (304) 918-8993 | Anthony Carlson | Email hidden; Javascript is required. | (304) 216-8886 | (304) 216-8886 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Andy Travis | |
04:00 PM | WV | Fairview | Bunner | 39.662097 | -80.214312 | 72 Upper Days Run, Fairview WV 26570 | Hot/Heavy Rain/Storms | Bunner | N/A | Blacksville | Sam Barker | (724) 825-6859 | NNE | Consultant | 14 | 20 | 1 | Cleaning up location after rig was moved out. | A heavy storm rolled in that seized cleaning operations on the Bunner pad. Upon leaving the site, Sam noticed soap bubbles forming in the ditchline along the lease road. Nothing was present on the pad, only the bottom half of the lease road & culvert. It appeared to be Dawn soap, which is used to clean the rig prior to a move. Its assumed that a truck load leaving location the prior days splashed some residual soap onto the blacktop lease road. The heavy downpour agitated the soap and made bubbles visible. The DEP inspector was notified. The following morning the soap suds were not visible. | < 1gal | none | No | Yes | Yes | No | Immediately | N/A | The following morning, the suds were no longer visible. | The incident will be discussed with the rig about cleaning loads prior to leaving location. | Sam Barker | Email hidden; Javascript is required. | (304) 629-2284 | (304) 629-2284 | Sam Barker | Email hidden; Javascript is required. | (304) 629-2284 | (304) 629-2284 | Josh Dalton | Email hidden; Javascript is required. | (724) 825-6859 | (724) 825-6859 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Josh Dalton | |
01:30 PM | WV | Blacksville | Lemley | 427063.7N | 1789013.1E | 781 Long Drain Rd. Core, WV 26541 | ~32degF, Rain/snow mix. | Lemley | N/A | Blacksville | James Harris | (330) 620-0143 | Complete Energy Services | Driver | 3 | 28 | 0.5 | During the Patterson 334 rig DeMOB from Lemley, hauling the VFD house to the stack out yard in Mt. Morris, PA | While hauling the load down the lease road (steep blacktop portion at the bottom of Mepco), the truck began to loose traction and the load pushed the tractor around. The driver attempted to correct the situation but ended up jack-knifed. The truck came to a stop positioned over a culvert entry to a small stream. When the trailer jack-knifed, it punctured a hole in the passenger side tank and released diesel fuel. There was a nearby pallet of absorbent material. The truck driver & pilot car drivers immediately began placing pads & socks to contain the spill and to minimize the amount of fuel that made it into the culvert & stream. The truck driver was not injured. | Less than 50 gallons | No | No | Josh Dalton & Andy Travis around 1:50pm | Yes by Andy Travis | No | Immediately | Underway | NGE is monitoring & samples are being collected for DEP | Brought out a road brush to clear any mud and a skidder to assist loads. | Brian Pumphrey | Email hidden; Javascript is required. | (304) 761-4676 | (304) 761-4676 | Joshua Grim | Email hidden; Javascript is required. | (304) 276-3899 | (304) 276-3899 | Josh Dalton | Email hidden; Javascript is required. | (724) 825-6859 | (724) 825-6859 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Josh Dalton | |
10:00 AM | WV | Blacksville | Mepco | Na | Na | na | sunny | Mepco Pad | 3H | Blacksville | Jeff Wilson | (304) 216-6854 | NNE Consultant | Water Transfer | 5 | 25 | 3 | Jeff was driving by pad when he saw the leak on the 3H and ESD'd the pad. | The Mepco 3H dump valve washed out and was leaking. Jeff Wilson was driving by when he saw the leak and ESD'd the pad. Nick Swartz and Matt Jones went to Mepco and saw that the dump valve had washed out. They replaced the valve and cleaned up the site. There was a small amount of produced water that got onto the ground. The DEP inspector was notified and the area was cleaned up and new material put down. The soil was also tested. | 2 gallon | no | yes | yes | yes | no | 10:05 | yes | some | UT test dump valves | John Landis | Email hidden; Javascript is required. | (304) 216-6854 | (304) 212-0434 | John Landis | Email hidden; Javascript is required. | (304) 216-6854 | (304) 212-0434 | John Landis | Email hidden; Javascript is required. | (304) 216-6854 | (304) 212-0434 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | John Landis | |
01:00 PM | WV | Blacksville | Boggess | 39.670122 | 80.09344 | 2030 Mason Dixon Hwy, Maidsville, WV | 80 deg sunny | Boggess | 3H | Blacksville | Kelby Fowler | (304) 377-6666 | PSC | Operator | 6 | 4 | 2 | Frac Operations Post Blender Swap | Josh Frazier, third party safety, noticed on pad walk around that PSC blender that had been swapped out was parked off containment and leaking water and FR mixture from tub. A total of 5 gal max had leaked out of tub and was under blender. | 5 gal | No | Yes | Yes | No | No | Immediate | Yes | No | All equipment was taken out of service for inspection and repair. No equipment will be left off containment | Tony Lewelln | Email hidden; Javascript is required. | (740) 819-9443 | (740) 819-9443 | Eric Boone | Email hidden; Javascript is required. | (304) 377-6666 | (304) 377-6666 | Criss VanGilder | Email hidden; Javascript is required. | (405) 757-8725 | (405) 757-8725 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Criss VanGilder | |
04:00 PM | WV | Daybrook | Kassay | N 39-39-09.20 | W 80-12-38.22 | County Route 25/3 Yank Hollow Road | 98º Sunny | Kassay | N/A | Blacksville | Troy Hamidi | (719) 459-2067 | NNE | Company Man | 8 | 17 | 0.75 | Rig crew instructed in the morning safety meeting to check equipment that needed to be capped and/or plugged. they men where told where their where caps, plugs and valves opened and to ensure the equipment was ready for transport prior to loading and hauling. The crew failed to ensure that the load and several others where road ready. The result was a 0.5bbl spill from the elk horn from a valve left open. The truck operated by Complete was loaded and hauling to Cummins from Matteo. The NNE company man, noticed drilling fluid along the top left side of the truck bed and wheels. The Company man inspected the truck and then headed up the lease road to find where the spill was located. The company man then took pictures, contacted NNE Drilling Engineer and went to Matteo to speak with the Patterson Rig Manager to make a plan for containment and cleaning. | A 0.5bbl spill occurred just off the Kassay Pad on the lease road heading down hill towards Cummins Pad due to the failure to properly inspect equipment prior to loading. Spill was contained and cleaned up quickly. | 0.5 bbl | no | yes | yes | no | no | immediate | yes | no | Patterson Management handling internally | Pedro Robles | Email hidden; Javascript is required. | (970) 397-6993 | (740) 298-9136 | Troy Hamidi | Email hidden; Javascript is required. | (719) 459-2067 | (719) 459-2067 | Josh Dalton | Email hidden; Javascript is required. | (724) 825-6859 | (724) 825-6859 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Troy Hamidi | |
10:30 PM | WV | Daybrook/Monongalia | Matteo | N 421911.5 | E 1771644.9 | 25 Yank Hollow Road Fairview, WV 26570 | Clear | Matteo | 4H | Blacksville | Michael Reed | (337) 344-4939 | NOV Solids | Night shift lead | 1 | 3 | 1.5 | Drilling operations, normal AFRS operations of backyard equipment running trough, pumps, and centrifuge equipment. | During drilling operations the NOV AFRS system failed to alarm the operators of a high fluid level and go into fail safe shutting down the pumps and flipping the "whale tail". This resulted in the trough overfilling and spilling out over the backside out of view releasing ~20Bbl of OBM onto containment. As soon as run over was spotted system was manually shut down by night shift lead(Michael Reed) and cleanup began. | 20Bbl | On Containment | Yes | Josh Dalton/Andy Travis | Andy Travis contacted DEP | unknown | Imediatley | Everything that could be cleaned up was moved and cleaned under matting and above | unknown | Clean up and reconfigure alarm to sequence auto shutdown. | Steven Wojoich | Email hidden; Javascript is required. | (412) 452-1785 | (412) 452-1785 | Joshua Grim | Email hidden; Javascript is required. | (304) 276-3899 | (304) 276-3899 | Josh Dalton | Email hidden; Javascript is required. | (724) 825-6859 | (724) 825-6859 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | ||
10:30 AM | WV | Blacksville | Yost | 39.641639 | -80.218056 | 3352 Daybrook Road, Fairview, WV 26570 | Sunny | Yost | AST | Blacksville | Michael Shreve | (304) 918-3050 | NNE | Construction Foreman | 5 | 5 | 5 | Conducting bi-monthly AST inspection. | While conducting the bi-monthly AST inspection, water was observed to be leaking on the outside of the AST and onto the ground. All water is within the AST's secondary containment and did not leave the site. The cause of the leak is undetermined at this time, until further investigation. The AST will be drained and the liner will be inspected for a failure. Once the failure is located, a repair will be made. If no failure is found, the liner will be replaced in its entirety. | 1 - 2 BBL | Yes | Yes | Yes | Yes | No | 10:30 AM, M Shreve notified C Patterson. 2:45 PM, C Patterson notified A Travis and G Knitowski (DEP) | Not by time of this report | Yes, see above | See above | Dave McDougal | Email hidden; Javascript is required. | (304) 941-5033 | (304) 212-0419 | Michael Shreve | Email hidden; Javascript is required. | (304) 918-3050 | (304) 918-3050 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Chris Patterson | |
03:07 PM | WV | Blacksville | Coastal | 39.662862 | -80.204444 | 1001 Daybrook Road, Fairview, WV 26570 | Sunny | Coastal | Coastal | Blacksville | Benjamin Musgrave | (681) 209-5838 | Nuverra | Water Truck Driver | 5 | 8.5 | 8.5 | Unloading water recovered from drilling from water trucks into AST on Coastal pad. | Driver was unloading when he noticed a leak on the ground. After further investigation, he noticed a wing nut on the truck's pump had broken, allowing the pump to leak. When the leak was discovered, the driver put down absorbent pads and notified his supervisor. Supervisor and HSE rep went to site to conduct clean-up. | 1 - 2 gallons | No | Yes | Yes | Yes | No | 3:07 PM, spill occurred; 3:16 PM, driver reported to supervisor; 3:57 PM, Nuverra reported to NNE; 4:46 PM, NNE reported to DEP. | Yes | No | Company has instructed all maintenance crews to check these wing nuts and locking devices for wear and/or cracks and replacing as needed. | Donald Reiner | Email hidden; Javascript is required. | (304) 594-6066 | (304) 291-0807 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Chris Patterson | |
05:00 PM | WV | Fairview | Cummins | N 39-39-09.20 | W 80-12-38.22 | 1698 Yank Hollow Road, Fairview WV 26570 | Rain Showers | Cummins | 10H | Blacksville | Nathan Caldwell | (724) 984-2538 | Northeast Natural Energy | Company man | 8 | 16 | 1 | Was notified of soap suds in run off water believed to be coming off the pad on a neighbors property. Went to investigate. | Upon skidding the rig this morning according to Decker drillings superintendent it is believed that the rig hands disconnected the mist pump lines on the containment. The mist pump lines contained soapy water. We had a torrential downpour. All water went to the back end of our containment which is the lowest point of the burm over flowing into the gravel. The max concentration soap to water is our mist tank is 30 Bbl's of fresh water to 2 gallons off soap. Corrective action was discussed with Deckers superintended, tool pusher and rig crew that anytime lines are disconnected they will be sucked out with the super sucker also additional catch pans will be place under the tote were soap is collected on the the containment. | Less than a gallon | No | NO | Yes | Yes | Yes | Immediately | No | Yes with DEP | Suck out all lines that are disconnected with the super sucker. | Josh Dalton | Email hidden; Javascript is required. | (724) 825-6859 | (304) 212-0424 | Nathan Caldwell | Email hidden; Javascript is required. | (724) 984-2538 | (724) 984-2538 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | ||
09:00 AM | WV | Maidsville | Boggess | 39.671520 | -80.089826 | 2030 Mason Dixon Hwy, Maidsville, WV 26541 | Sunny | Boggess | 5H | Blacksville | Jay Hewitt | (304) 382-1825 | Hewitt Energy Strategies | Owner | 4 | 15 | 1 | During an inspection of the backyard area, stressed vegetation was noticed on the backside of the Boggess pad. It appeared and was later confirmed that the source of the spill was base oil/drilling mud. | A flow line connecting the mud pits had a slow leak and had been dripping for some time. The location of the line is not readily visible without climbing between the tanks. The entire backyard area is on containment and matted. Unfortunately the leak accumulated over time and found its way under the containment due to a small hole under the matting. I contacted WVDEP, Gayne asked that we get the spill contained to make sure that it does not leave our LOD, and gave us permission for now to continue with drilling operations. Clean up will be done once the rig is moved off of location. | Estimate of 2 bbl spill | Spill is outside of containment | Spill has been contained | NNE contacted 5/23/2019 at 9:00 | Gayne Knitowski was contacted | Not at this time | Immediate Notification | Spill has not been cleaned up | Spill can be cleaned once rig leaves | Better housekeeping around mud pits | Jay Hewitt | Email hidden; Javascript is required. | (304) 382-1825 | (304) 382-1825 | Troy Hamidi | Email hidden; Javascript is required. | (719) 459-2067 | (719) 459-2067 | Josh Dalton | Email hidden; Javascript is required. | (304) 212-0424 | (304) 212-0424 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Andy Travis | |
11:15 AM | WV | Mon County | Kassay Pad | N 39.6583700 | W 80.1944621 | 190 Yank Hollow Road, Fairview, WV 26570 | Intermittent Rain | Kassay Pad | Kassay Pad | Blacksville | Tracy Davis | (304) 305-0786 | Bear Contracting | Cummins Pad Superintendent | 30 | 10 | 6 | Bear Contracting, who is building the Cummins Pad, stores the diesel fuel to refill their equipment on the Kassay Pad in a vessel. (The Cummins Pad entrance begins at the northern end of the Kassay Pad). Woodford, a subcontractor of Bear, was offloading diesel fuel with a fuel truck via hose into the vessel. | Summary of events occurred Monday, April 15, 2019. | 50 gallons +- | Secondary containment around vessel breached. Contained on Kassay well Pad. | Yes | Yes | no | no | Within 15 minutes of incident | Ongoing | Yes | NNE notifed, oil rags and booms placed. | Mark Urso | Email hidden; Javascript is required. | (304) 677-2195 | (304) 326-0160 | Tracy Davis | Email hidden; Javascript is required. | (304) 305-0786 | (304) 326-0160 | Dave McDougal | Email hidden; Javascript is required. | (304) 941-5033 | (304) 212-0419 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Dave McDougal | |
12:10 PM | WV | Clay | Yost | 39.6296 | -80.2149 | 000000000000000000 | 00000000000 | Yost | 11H | Blacksville | Josh Grim | (304) 276-3899 | NNE | Companyman | 8 | 18 | 2 | Diesel/water mixture under the mats most likely from an overfill of the boiler. A water truck had split the berming and was allowing the mixture to drip out onto the gravel, gravel was scooped up and disposed of and we began pulling mats to vacuum the liquid out from under them, extreme called out to repair section of containment. | Diesel/water mixture under the mats most likely from an overfill of the boiler. A water truck had split the berming and was allowing the mixture to drip out onto the gravel, gravel was scooped up and disposed of and we began pulling mats to vacuum the liquid out from under them, extreme called out to repair section of containment. | 1-2 gal | No | Yes | Yes | Yes | No | notified immediately | Yes | No | Scratched up gravel, vacuumed under mats. | Josh Grim | Email hidden; Javascript is required. | (304) 276-3899 | (304) 276-3899 | Josh Grim | Email hidden; Javascript is required. | (304) 276-3899 | (304) 276-3899 | Jay Hewitt | Email hidden; Javascript is required. | (304) 382-1825 | (304) 382-1825 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | ||
02:00 PM | WV | Blacksville | Coastal | 39.705639 | -80.204444 | 1001 Daybrook Road, Fairview, WV 26570 | Sunny | Coastal | AST | Blacksville | Bronson Martin | (702) 904-4301 | Comtech Inudstries, Inc. | Laborer | 1 | 1.5 | 1.5 | Re-fueling a portable heater unit. | "While re-fueling a third piece of equipment (a portable heater unit) the transfer / pump hose split and began to spray / release diesel fuel. The employee immediately shut down the pump and began to place spill pads to absorb the fuel. The fuel was on the bed of the truck as well as on the ground. Before the truck was moved it was cleaned to verify no additional areas would be affected. Approximately 2 - 4 gallons of diesel fuel was released (see attached photos). The spill area was cleaned up by placing the soiled spill pads and any dirt / rocks, that were affected, into collection buckets for disposal. The hose transfer line on the fuel cell was immediately replaced." | 2 - 4 gallons | No | Yes | Yes | No | No | 2:00 PM - spill occurred; 2:43 PM - Comtech notified NNE | Yes | No | Replaced split / failed hose on the transfer pump of the fuel cell; modify inspection procedure of fuel cell to include routine replacement of the transfer hose (at least every 6 months). | Levi Bristor | Email hidden; Javascript is required. | (724) 263-0105 | (724) 263-0105 | Anthony Carlson | Email hidden; Javascript is required. | (304) 216-8886 | (304) 216-8886 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Chris Patterson | |
05:00 AM | WV | Blacksville | Yost | 39.6296 | -80.2149 | 0000 | 35 degrees clear | Yost | 1H | Blacksville | Devon Runyon | (304) 212-0415 | Precision | Derrickman | 23 | 8 | 0.1 | Moving around immobile equipment in tight space | The Skidsteer was non functional in the front of the drive over. The derrickman attempted to move around the skidsteer with the extend a boom forklift as he needed to get to the other side of location. The rear right tire tagged the 4" mud line going to the drive over causing the hose to separate at the crimped collar causing a 1 to 1-1/2 bbl spill. The ground below and around the spill was excavated to remove all contaminants. | 1-1.5bbl | No | Yes | Yes | Yes | No | 5Min | Yes | No | Safety stand down, put a plan together to clean up area and a solution to prevent the incident in the future. | Troy Holliday | Email hidden; Javascript is required. | (570) 337-3077 | (000) 000-0000 | Troy Hamidi | Email hidden; Javascript is required. | (719) 459-2067 | (000) 000-0000 | Jay Hewitt | Email hidden; Javascript is required. | (304) 382-1825 | (000) 000-0000 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | ||
12:45 PM | WV | Monongalia County | Coastal | 39.705639 | -80.204444 | 1001 Daybrook Road, Fairview, WV 26570 | Overcast | Coastal | Coastal | Blacksville | Josh Null | (304) 599-8384 | RW Products | Manager | 2 | 6 | 6 | Crew was on the Coastal Pad removing solids from the AST, loading into vac boxes, and making ready for transport to disposal. | After the solids removal crew loaded one of the vac boxes, it was relocated from the work area to the staging area to wait for transport to disposal. As it was being unloaded from the roll-off truck to the staging area, the hatch door wasn't fully closed and allowed some of the solids/sludge to escape and spill onto the pad, outside secondary containment. The solids removal crew cleaned up the sludge and dressed in the area with new stone. | 5 gallons | No | Yes | Yes | No | No | 01/07/19, 12:45 PM - Notified of spill | Yes | No | Ensure all doors on vac boxes are shut and fully bound with chain binders; incorporate into JSAs going forward. | Pat Justice | Email hidden; Javascript is required. | (681) 285-5040 | (304) 277-1110 | Jeff Wilson | Email hidden; Javascript is required. | (304) 480-1414 | (304) 480-1414 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Chris Patterson | |
01:00 PM | WV | Grant Dist., Monongalia Co. | N/A | 39.615723 | -80.089051 | N/A | Overcast | Michael | Mon River Waterline | Blacksville | Anthony Carlson | (304) 216-8886 | Solo Construction | Water Consultant | 7 | 10 | 8 | Following up on notification that a diesel spill had occurred at the Booster #2 pump station on the Mon River Waterline. | On 03 Jan 19, at approximately 1:00 PM, a diesel spill was discovered at Booster #2 pump station on the Mon River Waterline, outside secondary containment and estimated to be 5 gallons. No waters of the state or US were affected. It was determined this occurred near the end of the last transfer activity and went unreported. After discovery, a crew was dispatched to remove the contaminated stone and replace with new stone. The Spill Hotline was called and provided the following reference number: 31-84925. DEP Waste and Water Inspector Travis Hayes is also aware of the spill and the remedial actions taken. | 5 gallons | No | Yes | Yes | Yes | Yes | 01/03/19, 1 PM - Spill Discovery & DEP notification; 4:30 PM - Spill Hotline | Yes | Yes | Removed contaminated stone and replaced with new stone | Casey Buckhanan | Email hidden; Javascript is required. | (304) 224-5567 | (304) 224-5567 | Anthony Carlson | Email hidden; Javascript is required. | (304) 216-8886 | (304) 216-8886 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Chris Patterson | |
08:00 AM | WV | Bl | Beach | NA | NA | NA | cold/icy | Beach | Beach Pad | Blacksville | David Beckner | (304) 380-7133 | NNE | Well Tender | 365 | 1 | 1 | Operations of Wells | Daybrook was filling the heater with fuel and overfilled heater causing fuel to spill on ground. | 5 gallons | no | yes | yes | yes | no | immediately | in process | no | Cleaned up | John Landis | Email hidden; Javascript is required. | (304) 216-6854 | (304) 212-0434 | David Beckner | Email hidden; Javascript is required. | (304) 380-7133 | (304) 212-0426 | John Landis | Email hidden; Javascript is required. | (304) 216-6854 | (304) 212-0434 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | John Landis | |
06:00 AM | WV | Blacksville | Campbell | NA | NA | NA | cold/icy | Campbell | 6H | Blacksville | David Beckner | (304) 380-7133 | NNE | Well Tender | 3 | 1 | 1 | Operations of Wells | The Campbell 6H was down and when checked on found that the dump valve had blown out. This caused produced water to flow out in Unit and on to ground. | 2bbls | no | yes | yes | no | no | immediately | yes | no | Cleaned up | John Landis | Email hidden; Javascript is required. | (304) 216-6854 | (304) 212-0434 | David Beckner | Email hidden; Javascript is required. | (304) 380-7133 | (304) 212-0426 | John Landis | Email hidden; Javascript is required. | (304) 216-6854 | (304) 212-0434 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | John Landis | |
06:25 PM | WV | Clay | Mepco | 39.662737 | -80.166485 | 579 Mepco Road, Fairview, WV 26570 | Rainy | Mepco | 2H & 4H | Blacksville | Jeff Wilson | (304) 480-1414 | Solo Construction | Water Consultant | 5 | 25 | 8 | No active task at time of notification of release. | On 9/16/18, at approximately 6:25 PM, NNE was notified by a landowner that water was overflowing an air release valve (ARV) vault and running down the hill. Landowner also notified WV DEP of the incident. NNE made notifications to supervision and dispatched field personnel to visually inspect the site and ensure the leaking had stopped. Once field personnel arrived at ARV site, water was still leaking and detected a one-inch drain valve was open on the bottom of the ARV. The valve was shut and the leaking stopped. Environmental contractor was called to bring erosion controls and gather water and soil samples to begin the remediation process. NNE personnel met with WV DEP Inspector, Gayne Knitowski, to review the site and discuss next steps. Remediation efforts will be ongoing until site is vacant of all contaminated material. Spill hotline was called and NNE was provided reference number 31-80825. | 635 | No | No | Yes | Yes | Yes | 9/16/18, 6:25 PM - Notification of spill; 9/17/18, 10:00 AM - meeting onsite with DEP Inspector; 9/17/18, 3:00 PM - erosion controls installed; 9/18/18, 8:00 AM - water/soil samples gathered | No | Yes | Remediate site until all contaminated materials are removed | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Chris Patterson | Email hidden; Javascript is required. | (304) 203-7034 | (304) 212-0417 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Chris Patterson | |
11:30 AM | WV | Maidsville | Jenkins | 39.711342° | -80.139292° | 3835 Mason Dixon Hwy, Maidsville WV 26541 | Sunny | Jenkins | Rig Move | Blacksville | Josh Frazier | (304) 517-6188 | NE Safety Solutions | Safety Consultant | 2 | 10 | 1 | While performing a site inspection, Josh Frazier noticed that there was a track of fluid spilled onto the Jenkins location road staging area. | After the rig move, Josh Frazier pulled onto location to perform a safety check and noticed a track of fluid where we had staged some of the Patterson equipment for the move, He notified supervision which in turn notified NNE Compnayman Josh Grim. Josh went out to check the area and get Chisler Brothers out to perform the clean up. By the time I had reached the location Chisler was already there and had absorbant on the spill and were prepping to scrape up any contamination and haul it off to be disposed of. | Less than one gallon | Spill was off containment on gravel staging area | The spill area was limited to the staging area | Josh Frazier notified as soon as spill was discovered | DEP inspector Gayne Knitowski was notified by voicemail | Spill line has not been contacted | Notification came from random safety inspection | Spill cleaned up | No follow up required | Need to do site inspection after move | Josh Grim | Email hidden; Javascript is required. | (304) 276-3899 | (304) 276-3899 | Josh Grim | Email hidden; Javascript is required. | (304) 276-3899 | (304) 276-3899 | Jay Hewitt | Email hidden; Javascript is required. | (304) 382-1825 | (304) 382-1825 | Hollie Medley | Email hidden; Javascript is required. | (304) 543-8932 | (304) 212-0422 | Andy Travis | Email hidden; Javascript is required. | (304) 951-0909 | (304) 212-0415 | Andy Travis | |
Time | State | Township/City | Pad | Latitude | Longitude | 911 Address | Weather | Well Lease | Well # | Well Field | Personnel/Witness Name | Personnel/Wittness Phone | Company | Position | Hitch Days | Years Oil/Gas | Years w/Comp. | Task | Summary | Spill Amount | On containment | Spill contained | NNE Contacted | DEP Contacted | Spill Line Contacted | Notification Timeline | Spill Cleaned Up | Follow Up Required | Corrective Action | Supervisor Name | Supervisor Email | Supervisor Phone | Supervisor Office Phone | Comp. Man Name | Comp. Man Email | Comp. Man Phone | Comp. Man Office Phone | NNE Name | NNE Email | NNE Phone | NNE Office Phone | NNE Name | NNE Email | NNE Phone | NNE Office Phone | NNE HSE Name | NNE HSE Email | NNE HSE Number | NNE HSE Office Phone | SUBMITTEE |